大同市守口堡水库胶凝砂砾石坝上下游固坡方案比选 被引量:1

Comparing and Selecting the Consolidation Scheme of Upstream and Downstream Dam Slopes for the Shoukoubao Cemented Sand-gravel Dam in Dangtong City
下载PDF
导出
摘要 文中结合工程实际情况,从进度、质量、经济、安全、环保等方面,分析论证了采用模板、异型夯板、挤压边墙、铺料箱与异型夯板组合四种固坡方式的优缺点,最终确定了大同市守口堡水库胶凝砂砾石坝上下游最优固坡方案。 Combining the actual situation of the project,from the aspects of progress, quality, economy, safety,environmental protection and so on,the paper analyzes and demonstrate the advantages and disadvantages of four kinds of slope consolidation methods including template, special shaped tamping plate, extrusion side wall, paving box and special shaped tamping plate.Finally, the optimal slope consolidation plan for upstream and downstream dam slopes of the cementing sand gravel dam in the Datong Shoukoubao Reservoir is determined.
作者 王一红 WANG Yi-hong
出处 《山西水利科技》 2018年第3期31-34,共4页 Shanxi Hydrotechnics
关键词 胶凝砂砾石坝 固坡方案 比选 cemented sand-gravel dam consolidation slope scheme comparison and selection
  • 相关文献

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部