2International Atomic Energy Agency. NS-G-3.3 Evaluation of seismic hazards for nuclear power plants: Safety guide [S]. Vien- na: International Atomic Energy Agency, 2002.
5EPRI. ALWR-URD, advanced light water reactor utility require- ments document [S]. U.S.: Electric Power Research Institute, 1995.
6EUR. European utility requirements for LWR nuclear power plants, 1955 DTN (Revision B) [S]. France: Electricity de France, 1995.
7U.S. NUREG-0800 Standard review plan for the review of safety analysis reports for nuclear power plants [S]. U.S.: Nuclear Regu- latory Commission, 2007.
8U.S. NRC. SECY-93-087 Policy, technical, and licensing issues pertaining to evolutionary and advanced light-water reactor (AL- WR) designs [S]. U.S.: Nuclear Regulatory Commission, 1993.
9James M T. Elimination of operating-basis earthquake policy is- sue, NRC-SECY-93-087[R]. U.S.: Nuclear Regulatory Commis- sion, 1993.
10U.S. NRC. RG1.61 Damping values for seismic design of nuclear power plants [S]. U.S.: Nuclear Regulatory Commission, 1973.