摘要
通过对三和特大桥水中墩76号~87号墩筑岛围堰施工的方案对比,选取"全断面填砂筑路及填砂筑岛+钢板桩围堰"方案,该施工方案快捷、施工方便、节约成本且安全可靠,很好地解决了三和特大桥水中施工难题。详细介绍了方案的相关理论、实践和筑岛围堰施工工艺,可为类似水中墩施工提供参考。
By comparing the cofferdam construction schemes of 76# - 87# pier of water piers in Sanhe super-large bridge,the paper selects the full cross-section sand filling road and sand filling island plus steel pile cofferdam,which is speedy,convenient,cost-saving and reliable to solve the construction difficulties in water construction of Sanhe super-large bridge,and mainly introduces the related theories of the scheme,the practice and the construction craft for the island cofferdam,so as to provide some reference for similar water pier construction.
作者
李建国
Li Jianguo(No.4 Engineering Co.,Ltd,China Railway ;Ath Bureau Group,Jinan 250002,Chin)
出处
《山西建筑》
2018年第18期147-149,共3页
Shanxi Architecture
关键词
便道施工
围堰施工
防护措施
技术难点
road construction
cofferdam construction
protection construction
technical difficulties