某厂加工车间深基础及双肢柱施工方案优化

Construction Scheme Optimization of Deep Foundation and Double-limb Column in a Processing Workshop
下载PDF
导出
摘要 某厂加工车间为钢筋混凝土排架结构,工程施工中对施工方案进行全面优化,采用轻型井点降水、钢板桩支护、预制双肢柱、矩形混凝土斜腹杆改为钢管内浇混凝土斜腹杆等措施,确保了施工工期和质量,降低了施工费用。 The processing workshop in a factory was reinforced concrete frame structure, and the construction scheme was optimized comprehensively in the construction. The measures such as the light well point drainage, the steel sheet pile support, the prefabricate double-limb column, and changing the rectangular concrete inclined tilted belly poles into concrete filled steel tube tilted belly poles, which were applicated to ensure the construction period and the quality, and reduce the construction cost.
出处 《有色冶金节能》 2018年第3期53-56,47,共5页 Energy Saving of Nonferrous Metallurgy
关键词 加工车间 深基础 钢板桩 双肢柱 施工方案优化 processing workshop deep foundation steel sheet pile double-limb column construction scheme optimization