3Karaki S H.Weather sensitive short-term load forecasting using artificial neural networks and time series[J].International Journal of Power and Energy Systems,1999,19(3):251-256.
5YangHongtzer,HuangChaoming,HuangChinglien.Identification of ARMAX model for short term load forecasting:an evolutionary programming approach[J].IEEE Transactons on Power Systems,1996,11(1):403-408.
6Srinivasan D,Chang C S,Liew A C.Demand forecasting using fuzzy neural computation,with special emphasis on weekend and public holiday forecasting[J].IEEE Transactions on Power Systems,1995,10(4):1897-1903.
7Hippert H S,Pedreira C E.Estimating temperature profiles for short-term load forecasting:Neural networks compared to linear models[J].IEE Proceedings:Generation,Transmission and Distribution,2004,151(4):543-547.
8KhotanzadA,DavisMH,AbayeA,etal.Artificialneuralnetwork hourly temperature forecaster with applications in load forecasting.IEEE Transactions on Power Systems[J].1996,11(2):870-876.
9Khotanzad A,Afkhami-Rohani R,Lu Tsunliang,et al.ANNSTLF-a neural-network-based electric load forecasting system[J].IEEE Transactions on Neural Networks,1997,8(4):835-846.
10Khotanzad A,Afkhami-Rohani R,Maratukulam D.ANNSTLF-artificial neural network short-term load forecaster-generation three[J].IEEE Transactions on Power Systems,1998,13(4):1413-1422.