采矿工程施工中不安全技术因素及措施 被引量:7

Unsafe technical factors and measures in mining engineering construction
下载PDF
导出
摘要 采矿工程施工工作危险系数高,安全控制难度大,极易出现人员伤亡事故,所以要从技术角度实施安全监管,尽可能消减施工中的不安全技术因素。本文主要从采矿井巷类项目、采矿作业面施工和采矿爆破作业3方面探讨了它们其中所蕴含的诸多不安全技术因素及相应解决措施。 The risk factor of mining engineering construction is high, the safety control is difficult, and the casualty accident is easy to appear. Therefore, it is necessary to implement safety supervision from the technical point of view and reduce the unsafe technical factors in the construction as much as possible. This paper mainly discusses the unsafe technical factors and corresponding measures in the 3 aspects of mining and roadway projects, mining operation surface construction and mining blasting operation.
作者 马天勇 张丕洪 童永杰 MA Tian-yong;ZHANG Pi-hong;TONG Yong-jie(Xinjiang geological and Mining Bureau First Geological Brigade,Changji 830000,China;X injiang Baodi Mining LiMited by Share Ltd,Changji830000,China;Hejingxian preparation for Mining liMited liability coMpany,Changji 830000,China)
出处 《世界有色金属》 2018年第7期52-52,54,共2页 World Nonferrous Metals
关键词 采矿工程施工 不安全技术因素 作业面 爆破作业 mining engineering construction unsafe technical factors operation surface blasting operation
  • 相关文献

参考文献2

二级参考文献5

共引文献5

同被引文献18

引证文献7

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部