摘要
本文主要阐述了全氢冷燃气轮发电机定子铁心叠装工艺方案的改进,从操作性、经济性、生产效率等方面对比介绍了新旧实现方式的优缺点,以及实现新工艺方案所需配套装置的结构设计。
This paper describes an improvement on the technology scheme of the lamination equipment for the gas turbine generator with full hydrogen cooling. The advantages and disadvantages of the original and the new technology scheme are outlined from the aspects of operability,economical and productive efficiencies. The configuration design needed to realize the new scheme of the lamination equipment is presented.
作者
申东
赵江波
罗建芳
SHEN Dong;ZHAO Jiangbo;LUO Jianfang(Dongfang Electric Machinery Co.,Ltd.,618000,Deyang,Sichuan,China)
出处
《东方电气评论》
2018年第2期50-52,65,共4页
Dongfang Electric Review
关键词
全氢冷燃气轮发电机
定子铁心
叠装装置
结构设计
gas turbine generator with full hydrogen cooling
iron core
lamination equipment
configuration design