期刊文献+

提高远程费控执行成功率的方法研究 被引量:2

Research on Methods of Improving Success Rate in Cost Remote Control
下载PDF
导出
摘要 在实际应用中,远程费控跳合闸业务经常发生停复电执行失败的情况,增加了电费及时回收的难度,带来了用户投诉风险。针对国网辽宁省电力有限公司当前费控工单执行成功率相对偏低现状进行深入研究,从主站、通信、现场终端及表计不同角度综合分析执行过程中费控工单下发失败的原因,以及影响费控执行成功率的因素,寻求最佳解决方案,提出提高费控执行成功率的方法,从而提高全省费控执行成功率。 In the actual application of remote cost control trip gate service, a case of failure to stop and restore power often happenswhich increases the difficulty of timely recovery of electricity charges and brings the risk of user complaints. It focuses on the currentsituation of relatively low implementation success rate of fee control work orders in State Grid Liaoning Electric Power Co., Ltd. Itcomprehensively analyzes the reasons for the failure of fee control work orders in the process of implementation from different perspec-tives of main station, communication, field terminal and meter. The factors affects the success rate of fee control execution. In order toseek the best solution, it puts forward the method which improve the cost control execution success rate and improve the province's costcontrol execution success rate.
作者 尚莹 李忠诚 康丽雁 张穆昕 刘馨然 SHANG Ying, LI Zhongcheng, KANG Liyan, ZHANG Muxin, LIU Xinran(Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd., Shenyang, Liaoning 110006, Chin)
出处 《东北电力技术》 2018年第7期15-17,共3页 Northeast Electric Power Technology
关键词 用电信息采集系统 远程费控系统 停复电 费控策略 electric information acquisition electricity cost remote control system stop or resume electricity electricity costcontrol strategy
  • 相关文献

参考文献7

二级参考文献26

共引文献42

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部