摘要
介绍GIS变电站扩建相关注意事项及调试流程,针对GIS变电站扩建工程二次不停电接入提出一种分类复式统计表法,并以仁布110kV户内GIS变电站扩建工程对不同系统不停电接入为例来说明该方法的实用性。
This paper introduces the related considerations and debugging process of the GIS substation expansion,and put forwards a classified double-entry statistics method for the secondary non-blackout access of the GIS substation expansion project.In this paper,an example of the expansion project of Renbu 110 kV GIS substation is given to illustrate the practicability of this method.
作者
唐成军
李欣
TANG Chengjun;LI Xing(Hunan Power Grid Engineering Co.,Ltd.,Hengyang 421002,China;Hunan Institute of Technology,Hengyang 421002,China)
出处
《电工技术》
2018年第11期151-153,共3页
Electric Engineering
基金
湖南省教育厅科研项目(编号13C02)
关键词
不停电接入
复式统计表
GIS变电站
non-blackout access
double-entry statistical table
the GIS substation