摘要
针对乌江渡发电厂#2机A修后调速器关机时间没有拐点现象,对分段关闭装置进行了分析,并提出了处理措施和防范措施,消除了安全隐患,保证了机组的安全稳定运行。
There is no turning point in the shutdowm time of the governor of unit 2 in Wujiangdu power plant.The step closing device is analyzed.The treatment measures and preventive measures are put forward to eliminate the safety hazards and ensure the safe and stable operation of the unit.
作者
郑伟
ZHENG Wei(Wujiangdu Power Planls,Zunyi 563104,China)
出处
《电工技术》
2018年第9期114-115,共2页
Electric Engineering
关键词
调速器系统
分段关闭装置
故障分析
拐点
governor system
step closing device
fault analysis
turning point