针对铁路通信工程的特点,结合中国铁路南宁局集团有限公司近年来新建铁路项目提前介入工作经验,对铁路通信专业提前介入工作中存在的问题进行分析,通过分析与研究,提出应对措施。为进一步做好铁路通信工程提前介入工作,分工程设计、工程实施和工程验收阐述工作的重点阶段和主要内容,通过掌握工作重点来确保铁路通信工程的建设质量。
According to the characteristics of railway communication engineering, combined with the new railway project early intervention work experience of the Nanning Group Company in recent years, this paper analyzes the problems existing in the early intervention of the railway communication major, through analysis and research, measures to deal with the problems are put forward. In order to further advance the early intervention work of railway communication engineering, the key stages and main contents of the work are elaborated in the stages of engineering design, engineering implementation and engineering acceptance, to ensure the construction quality of railway communication engineering by mastering the key emphasis in work.
作者
谢庆楚
Xie Qingchu(Signal & Telecom Division,China Railway NBOOJOH Group Co.,Ltd.,NBOOJOH 530029,Chin)
出处
《铁路通信信号工程技术》
2018年第7期35-39,共5页
Railway Signalling & Communication Engineering
关键词
铁路工程
通信专业
提前介入
Railway engineering
Communication major
Early intervention