摘要
本文以山西长治市经坊煤矿斜井施工为研究背景,对斜井综掘机掘进的制约因素、快速掘进施工工艺进行分析,优化斜井综掘机掘进各项关键技术,并强调了施工管理的重要性,为斜井综合机械化掘进积累了宝贵经验。
In this paper, taking the construction of the inclined shaft of the Jingfang Coal Mine in Changzhi city of Shanxi as the research background, this paper analyzes the restrictive factors of the excavation of the inclined well mechanized excavator and the rapid tunneling technology, and optimizes the key techniques of the excavating machine in the inclined well, and emphasizes the importance of the construction management, and accumulates valuable experience for the comprehensive mechanized excavation of the inclined well.
作者
张云飞
Zhang Yun-fei(Shanxi Changzhi Jingfang Coal Industry Co.,LTD.,Shanxi Changzhi 047100)
出处
《山东煤炭科技》
2018年第7期58-59,64,共3页
Shandong Coal Science and Technology
关键词
综合机械化
斜井
综掘机
施工管理
暗硐
integrated mechanization
inclined shaft
comprehensive tunneling machine
construction management dark adit