2GORANSSON L, JOHNSSON F. Large scale integration of wind power moderating thermal power plant cycling[J]. Wind Engineering, 2010, 28(2): 1-15.
3BILLINTON R, BAI G. Generating capacity adequacy associated with wind energy[J]. IEEE Trans on Energy Conversion, 2004, 19(3): 641-646.
4da SILVA A M L, SALES W S, MANSO L A F. Long-term probabilistic evaluation of operating reserve requirements with renewable sources[J]. IEEE Trans on Power Systems, 2010, 25(1): 106-116.
5BILLINTON R, GAO Y, KARKI R. Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation [J]. IEEE Trans on Power Systems, 2009, 24(3): 1375- 1382.
6FORD A P, HARM W L. Market based adequacy: reliability and CBM/ATC calculations[C]// Proceedings of IEEE Power Engineering Society Winter Meeting, January 27-31, 2002, New York, NY, USA: 18-23.
7KARKI R, HU P, BILLINTON R. A simplified wind power generation model for reliability evaluation[J]. IEEE Trans on Power Systems, 2006, 21(2): 533-540.
8IEEE RTS Task Force of APM Subcommittee. IEEE reliability test system[J]. IEEE Trans on PAS, 1979, 98(6): 2047- 2054.