3Elliott K S. Research and Development in Preeast Concrete Framed Structures [ J]. Progress in Structural Engineering and Materials, 2000, 2(4) : 405 -428.
4Ertas O, Ozden S, Ozturan T. Ductile Connections in Preeast Concrete Moment Resisting Frames [ J]. PCI Journal, 2006, 51(3): 66-76.
5Choi H K, Choi Y C, Choi C S. Development and Testing of Precast Concrete Beam-to-column Connections [ J ]. Engineering Structures, 2013, 56 : 1820 ~ 1835.
6Scott B D, Park R, Priestley M J N. Stress -strain Behavior of Concrete Confined by Overlapping Hoops at Low and High Strain Rates [ A ]. ACI Journal Proceedings[C]. ACI, 1982, 7 9(1) :13 -27.
7Filippou F C, Popov E G, Bertero V V. Effects of Bond Deterioration on Hysteretic Behavior of Reinforced Concrete Joints [ R ]. California: University of California,Berkeley, 1983.
8Menegotto M, Pinto E. Method of Analysis for Cyclically Loaded Reinforced Concrete Plane Frames Including Changes in Geometry and Non-elastic Behavior of Elements under Combined Normal Force and Bending [C ]//IABSE Symposium on Resistance and Ultimate Deformability of Structures Acted on by Well-Defined Repeated Loads. Lisbon Portual, 1973.
9ABAQUS, Inc. ABAQUS Keywords Reference Manual [ M]. 2006.