期刊文献+

任务顺序刀库更新策略对加工中心换刀频率的仿真优化 被引量:2

Simulation optimization of tool changing frequency in machining center considering the magazine update strategy of task sequence
下载PDF
导出
摘要 针对含有单个自动加工中心的自动生产线,利用Plant Simulation仿真平台建立仿真模型,根据不同的情形设计和实施一系列试验,通过调整相关参数和使用不同刀库更新策略,统计换刀相关系统性能指标,最后提出一种在随机条件下的多任务多工序加工的刀库更新策略。 For the automated production lines with a single automated machining center, a simulation model was built by using the Plant Simulation plattorm to design and imple- ment a series of experiments based on different scenarios. By adjusting the related parame- ters and using different tool magazine updating strategies, the system performance indexes of tool changeover were statistically analyzed. Finally, a tool magazine updating strategy for multitasking and multi-process machining under random condition was proposed.
作者 李泽龙 焦勇清 鲁一凡 LI Ze-long;JIAO Yong-qing;LU Yi-fan(Key Laboratory of Computer Integrated Manufacturing System of Guangdong Province,Guangdong University of Technology,Guangzhou,Guangdong 510006,China)
出处 《模具工业》 2018年第7期6-10,15,共6页 Die & Mould Industry
关键词 加工中心 仿真建模 刀库更新 随机任务 machining center simulation modeling tool magazine update random task
  • 相关文献

参考文献3

二级参考文献35

  • 1郭兴,杜润生,杨叔子.基于人工神经网络的铣刀破损功率监测[J].华中理工大学学报,1996,24(6):47-49. 被引量:3
  • 2HUGE E C.Total quality-an executive guide for the 1990s[M].Chicago:Richard D.Irwin,Inc.,1990.
  • 3DEGRAMO E P,BLACL J T,KOOSHER R A.Material and process in manufacturing[M].New York:Macmillan,1988.
  • 4MONTGOMERY D C.The use of statistical process control and design of experiments in product and process improvement[J].IIe Transaction,1992,24(1):9-17.
  • 5JEANG A.Optimal tool replacement with non-decreasing tool wear[J].International Journal of Production Research,1992,30(2):299-314.
  • 6JEANG A.Tool replacement policy for probabilistic tool life and random wear process[J].Quality and Reliability Engineering International,1999,15(2):205 -212.
  • 7XIE M.Process capability indices for a regularly adjusted process[J].International Journal of Production Research,2002,40(10):2367 -2377.
  • 8AHMAD M,SHEIKH A K.Bemstein reliability model:derivation and estimation of parameters[J].Reliability Engineering,1984,8(1):131-148.
  • 9ZHOU C,CHANDRAJ,RICHARD W.Optimal cutting tool replacement based on tool wear status[J].International Journal of Production Research,1990,28(7):1357-1367.
  • 10LIU P H,MAKIS V,JARDINE A KS.Scheduling of the optimal tool replacement times in a flexible manufacturing system[J].HE Transactions,2001,33(6):487-495.

共引文献8

同被引文献18

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部