期刊文献+

过上覆采空区煤柱巷道支护工艺应用 被引量:7

Application of roadway supporting technology cross overlying gob with coal pillars
下载PDF
导出
摘要 同煤集团四台煤矿14煤412盘区51220巷掘进工作面在掘进过程中需要过上覆12煤412盘区81220采空区与12煤412盘区81001采空区所留设的煤柱,在应力集中煤柱区域还要与同层相邻的14煤412盘区81218工作面进行采掘交锋,对51220巷煤柱下支护工艺进行了完善,保证了支护安全。 In the process of driving working face of 51220 roadway for No.412 panel in No.14 coal seam of Sitai Mine, Datong Coal Industry Group, the working face should cross the coal pillar of overlying 81220 gob of No.412 panel in No.12 coal seam and the coal pillar of 81001 gob of No.412 panel in No.12 coal seam, it also encounter the adjacent 81218 working face of No.412 panel in No.14 coal seam. The supporting technology of coal pillar under 51220 roadway was perfected to ensure the safety of supporting.
作者 陆建忠 LU Jian-zhong(Sitai Mine,Datong Coal Industry Group,Datong,Shanxi,03700)
出处 《煤炭科技》 2018年第2期125-127,共3页 Coal Science & Technology Magazine
关键词 采掘交锋 支护工艺 煤柱 应力集中 mining and driving confrontation supporting technics coal pillar stress concentration
  • 相关文献

同被引文献22

引证文献7

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部