长距离大断面矩形顶管顶进力计算及监测数据分析 被引量:5

CALCULATION OF JACKING FORCE AND MONITORING DATA ANALYSIS OF LONG DISTANCE RECTANGULAR PIPE JACKING WITH LARGE SECTION
下载PDF
导出
摘要 现今国内对长距离大断面矩形顶管的研究相对较少,本文依托于云南某地下矩形顶管工程,探讨其顶进力计算,并与实测结果进行对比。结果表明,对于长距离大断面矩形顶管,顶管与土体之间的摩阻力计算可按照法向应力与摩擦系数进行计算;当顶进距离较小时,实测顶进力基本保持不变,且大于理论顶进力;当顶进距离较大时,实测顶进力随着顶进距离的增大而增加。 There is no comprehensive study of the long distance rectangular pipe jacking with large section. This paper based on the rectangular pipe jacking project in yunnan province researches the calculation of jacking force and compares the results with monitoring data. The results show that, for long distance rectangular pipe jacking with large section, frictional resistance between pipe jacking and soil could be calculated according to normal stress and friction coefficient. When jacking distance is short, the measured jacking force is almost invariant and biggerthan theoretical jacking force. When jacking distance is long, the measured jacking force increases with the jacking distance.
作者 唐正伟 TANG Zhengwei(China Railway Siyuan Group Southwest Survey and Design Co., Ltd., Kunming 650200, Chin)
出处 《低温建筑技术》 2018年第7期124-127,142,共5页 Low Temperature Architecture Technology
关键词 长距离 矩形顶管 顶进力 施工监测 long distance rectangular pipe jacking jacking force construction monitoring
  • 相关文献

参考文献6

二级参考文献5

共引文献118

同被引文献42

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部