摘要
叙述了天津钢管公司220kV总降压变电站33kV系统设备运行的概况。在消化吸收引进先进技术的基础上,针对国外设备存在的一些问题进行了分析及技术改造。
The general situation of 33 kV system equipments for 220 kV general stepdown substation in Tianjin Pipe Corporation is described. On basis of digestion and absorption of overseas advanced technology, the problems of imported equipments are analysed and the technical reform has been done.
出处
《天津冶金》
CAS
2002年第4期22-25,共4页
Tianjin Metallurgy