跨武九铁路特大桥跨303省道支架现浇连续梁施工技术 被引量:1

Construction Technology of Cast-in-Place Continuous Beam of Extra-Large Bridge Spaning Wuhan-Jiujiang Railway and S303 Provincial Highway
下载PDF
导出
摘要 介绍了跨武九铁路特大桥现浇连续梁的支架结构施工、模板安装、混凝土浇筑及养护等施工技术。实施结果证明,采用满堂碗扣脚手架进行铁路连续梁现浇施工,其支架体系操作方便,布置合理、稳定并安全可靠。 This paper introduces the supporting structure construction, template installation, concreting and maintenance and other construction techniques of cast-in-place continuous beam of extra-large bridge spanning Wuhan to Jiujiang railway. The implementation results show that the full hall bowl-shaped scaffold for railway continuous beam cast-in-place construction realizes easy scaffolding system operation,reasonable layout, high stability and safety.
作者 党云岗 DANG Yun-gang(The Road and Bridge Engineering Co.Ltd.of China Railway 16th Bureau Group Co.Ltd.,Beijing 101500,China)
出处 《工程建设与设计》 2018年第14期176-177,共2页 Construction & Design for Engineering
关键词 碗扣脚手架 模板 混凝土 bowl-shaped scaffold template concrete
  • 相关文献

二级参考文献12

  • 1GB 5001722003钢结构设计规范[S].
  • 2JTJ 024-85,公里桥涵地基与基础设计规范[S].
  • 3汪祖铭,王崇礼.公路桥涵设计手册·墩台与基础[M].北京:人民交通出版社,1991.
  • 4JTJ022-85.公路砖石及混凝土桥涵设计规范[S].[S].,..
  • 5JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..
  • 6JTGB01-2003.公路工程技术标准[S].[S].,..
  • 7JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 8黄绳武.桥梁施工及组织管理[M].北京:人民交通出版社,1999.271.
  • 9王华廉.桥梁施工[M].北京:中国铁道出版社,1996.
  • 10范文兴,庞继高,施洲.深基坑铺盖贝雷梁桥下穿城市干道施工设计[J].城市道桥与防洪,2008(1):57-60. 被引量:5

共引文献6

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部