摘要
沿海通道福厦线引入福州枢纽工程的关键环节就是新建接触网与福州枢纽既有接触网的接火施工。本工程接火范围涉及面广、影响范围大、制约因素多,确保施工过程安全成为关键。本文结合工程实际,对接火施工改造实施方案的编制、实施要点、安全注意事项及实施方法作了初步的探讨。
Coastal Corridor Project of Fuzhou Fuzhou-Xiamen line into a key link is the new hub for both OCS and Fuzhou energize the catenary construction.Energize this project covers a wide range of influence range,to many restrictions,security has become critical to ensure the construction process,this paper,engineering,construction reformeut butt fire preparation,Implementation,safety issues and the implementation of a preliminary way Discussion.