3Ahmed T N, Ruwanpura J Y,Clark R, Predicting schedule and cost elements' variation for EPC projects in Alberta [ C ] . Construction Research Congress 2005 : Broadening Perspective-Proceedings of the Congress, San Diego, USA, 2005 : 757-766.
4Back W E, Moreau K A.Cost and schedule impacts of information management on EPC process[J], Journal of Management in Engineering. 2000.16 ( 2 ) : 59-70.
5Zhong Denghua, Li Jingru, Zhu Huirong, et al. Geographic information system-based visual simulation methodology and its application in concrete dam construction processes [J]. Journal of Construction Engineering and Management, 2004, 130 ( 5 ) : 742-750.
6Dzeng R J, Tsemg H P, Wang W C.Automating schedule review for expressway construction [J]. Journal of Construction Engineering and Management, 2005,131 ( 1 ) : 127-136.