摘要
城市轨道交通大客流的冲击造成了运力与需求之间的尖锐矛盾。本文结合北京地铁线路和客流实际,提出了基于地铁列车承载能力的套跑交路方案,并对方案进行了分析比较。
There is a sharp contradiction between the huge needs of the passengers and the capacity of the metro system.In this paper,proposed a set of crossing programs based on the capacity of metro trains according to the actual situation of Beijing metro lines and passengers.
出处
《科技传播》
2011年第13期33-34,共2页
Public Communication of Science & Technology
关键词
地铁列车
列车承载
套跑
subway train
capacity of metro train
crossing road