全风化花岗岩富水隧道浅埋段开挖施工技术研究 被引量:4

Study on excavation construction technology for shallow buried section of fully weathered granite water tunnel
下载PDF
导出
摘要 石长铁路与益娄铁路间下行疏解线李家冲隧道为单线隧道,穿越地层为燕山晚期花岗岩全风化层,结构较松散,透水性强,自稳性差,在重力作用下易坍塌。该隧道多处浅埋,局部存在软弱夹层及导水裂隙,地质条件差,地下水发育,为确保安全顺利的通过浅埋段施工,结合施工实践介绍全风化花岗岩浅埋富水隧道开挖施工技术,以供参考。 The downstream dredging line of Lijiachong tunnel was a single-line tunnel,which between the Shimen-Changsha Railway and the Yiyang-Loudi Railway.The crossing stratum was a fully weathered layer of Late Yanshanian granite with loose structure,strong water permeability,and poor self-stabilization.It easily collapses under the action of gravity.The tunnel has many shallow burial sites,with weak interlayers and water-guiding fissures locally,poor geological conditions,and groundwater development.To ensure safe and smooth construction through shallowburied sections,this paper describes the construction of shallow-buried water-enriched tunnels for full-weathering granites in combination with construction practices.Technology for reference.
作者 戚利平 Qi Liping(Jishou University Zhangjiajie College,Zhangjiajie 427000,Chin)
出处 《山西建筑》 2018年第20期147-148,共2页 Shanxi Architecture
基金 吉首大学张家界学院院级科研项目资助(zyyb201704)
关键词 全风化花岗岩 富水隧道 超前支护 监控量测 fully weathered granite water-enriched tunnels advance support monitoring measurenlent
  • 相关文献

参考文献2

二级参考文献6

共引文献8

同被引文献20

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部