期刊文献+

斜拉桥主塔上横梁施工技术研究 被引量:7

Construction technology research on cable-stayed bridge of the main tower beam
下载PDF
导出
摘要 运用桁架法进行斜拉桥主塔横梁施工能够充分发挥其结构特性及空间优势,有效保证施工质量及施工工期,结合辰塔公路越黄浦江大桥新建工程主塔施工的具体特点以及现场施工情况,选用桁架法施工上横梁,极大的缩短了总施工工期,为今后类似工程提供参考。 The use of truss law for cable-stayed bridge of the main tower beam construction can give full play to its structural characteristics and advantages of space,it’s effective guarantee of construction quality and construction period.With the specific features and site of the main tower construction of the new project of Chen-Ta highway which across the Huangpu River bridge,using truss method to construct beam,greatly shorten the total construction period,providing reference for similar projects in the future.
作者 邓文武 Deng Wenwu(Shanghai Foundation Engineering Group Co.,Ltd,Shanghai 200433,Chin)
出处 《山西建筑》 2018年第20期153-155,共3页 Shanxi Architecture
关键词 斜拉桥 主塔 上横梁 桁架 cable-stayed bridge main tower upper beam truss
  • 相关文献

参考文献2

二级参考文献8

共引文献3

同被引文献31

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部