摘要
海洋平台从基本设计到海上安装完成,各个阶段都要对现阶段设计重量重心进行严格统计和控制,其对平台设计及施工有重要的指导意义,是确保最终建造完成的重量与设计之初的重量一致的关键环节,海洋平台重量重心控制也是设计及建造方项目管理的重要内容。
From the basic design to the compl etion of offshore installation, the design weight center of gravity of the offshore platform shall be strictly counted and controlled at each stage, which has important guicling significance for the platform design and construction, it is also the key link to ensure that the final construction weight is consistent with the weight at the beginning of the design. The weight center of gravity conlrol of the offshore platform is also one of the important contents of the design and the project management of the builder
作者
孙超
金利华
朱海山
SUN Chao;JIN Li-hua;ZHU Hai-shan(Offshore Oil EngineeringCo.Ltd.,Tianjin 300461,China)
出处
《工程建设与设计》
2018年第15期220-222,共3页
Construction & Design for Engineering