期刊文献+

大采高窄煤柱沿空巷道围岩稳定性控制对策研究 被引量:3

Study on Surrounding Rock Stability Control Strategy of Gob-Side Entry with Narrow Pillar at Large Height Mining Face
下载PDF
导出
摘要 以羊场湾矿130205大采高工作面沿空巷道为研究对象,综合现场调研、理论分析、力学建模、现场试验等方法,对大采高窄煤柱回采巷道破坏机理和支护技术进行了深入研究。分析了沿空巷道围岩的破坏过程及破裂区范围;提出了沿空巷道围岩控制的指导思想和以确保保护煤柱完整性、提高系统协调性、运用不对称支护结构为核心的支护理念。 Taking the gob-side entry of 130205 large height mining face as the research object, based on the field investigation, theoretical analysis, mechanical modeling and field test, the surrounding rock failure mechanism and supporting technology for the gob-side entry with large mining height are explored in depth. The failure process of surrounding rock and the range of fracture zone in the roadway along the goaf are analyzed. The guiding principle of controlling the surrounding rock of gob-side entry is put forward. The idea based on supporting the integrity of the coal pillar, improving the coordination of the supporting system and the asymmetric support structure is put forward.
作者 秦兵文 谢福星 QIN Bing-wen1, XIE Fu-xing2,3(1. Inner Mongolia Baoshan Baoma Mining Co., Ltd., Xilinhot 026000, China ; 2. Institute of Mine Construction, Tiandi Science and Technology Co., Ltd., Beijing 100013, China; 3. Beijing China Coal Mine Engineering Co., Ltd., Beijing 100013, Chin)
出处 《煤炭技术》 CAS 2018年第8期28-30,共3页 Coal Technology
基金 国家自然科学基金资助项目(51604114)
关键词 大采高 窄煤柱 沿空巷道 破坏过程 不对称 large mining height narrow coal pillar gob-side entry failure process asymmetric
  • 相关文献

参考文献3

二级参考文献20

共引文献135

同被引文献41

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部