摘要
以泉店煤矿滑坡治理工程项目为研究对象,对间隔浇筑面进行抗压强度试验与点荷载试验。同时对间隔浇筑面采取植筋加固措施后进行模拟分析,发现间隔浇筑面能够明显降低混凝土试件的抗压强度与极限荷载,间隔面凿毛处理有助于提高混凝土的抗压强度与极限荷载。间隔浇筑处植入钢筋之后局部拉应力过大问题得到有效解决,间隔浇筑面承受应力随着植入钢筋配筋率的增大而越小。
Taking the Quandian coal mine landslide control project as the research object. The compressive strength test and the point load test on the interval pouting surface were carried out. The simulation analysis shows that the interval pouting surface can significantly reduce the compressive strength and ultimate load of concrete specimens, and the chiseling of the spacers can help to improve the compressive strength and ultimate load of concrete. The placement of steel spacing after the placement of the local tensile stress is too large to effectively solve the problem of spacing pouring surface with the reinforcement rate of steel reinforcement increases.
作者
张立敏
ZHANG Li-min(Xuchang University, Xuchang 461000, Chin)
出处
《煤炭技术》
CAS
2018年第8期62-64,共3页
Coal Technology
基金
河南省高等学校重点研究项目(15A560009)
关键词
间隔浇筑面
抗压强度
极限荷载
植筋加固
spacing pouring surface
compressive strength
ultimate load
anchorage reinforcement