摘要
文章结合百色大道(一期)工程K23+105~K23+225段右侧桩板式挡土墙施工实例,介绍了逆作法施工工序,阐述了植筋施工与变形缝设置方法,供类似工程施工参考。
Combining the construction of right-side pile-plate retaining wall of K23 +105 ~K23 +225 section in Baise Avenue( Phase I) Project,this article introduced the construction process of reversed method and described the anchorage construction and deformation joint setting methods,thereby providing the reference for the construction of similar projects.
作者
李志强
符蕾
陆宇翔
LI Zhi-qiang;FU Lei;LU Yu-xiang(Guangxi Communications Design Group Co.,Ltd.,Nanning,Guangxi,53002)
出处
《西部交通科技》
2018年第4期57-59,190,共4页
Western China Communications Science & Technology
关键词
桩板式挡土墙
逆作法
施工
植筋
变形缝
Pile-plate retaining wall
Reverse construction
Construction
Anchorage
Deformation joint