7Jafar Khademi Hamidi,Kourosh Shahriar,Bahram Rezai,Jamal Rostami.Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system[J].Tunnelling and Underground Space Technology incorporating Trenchless Technology Research.2010(4)
8J. Hassanpour,J. Rostami,J. Zhao.A new hard rock TBM performance prediction model for project planning[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research . 2011 (5)
9Development of a new direct test method for estimating cutter life, based on the Sievers’ J miniature drill test[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research . 2006 (1)
10M Sapigni,M Berti,E Bethaz,A Busillo,G Cardone.TBM performance estimation using rock mass classifications[J]. International Journal of Rock Mechanics and Mining Sciences . 2002 (6)