摘要
首钢京唐公司2×300 MW锅炉固定式暖风器,在非冬季期间依然留在风道内,产生阻力,增加电耗。通过技术改造,将暖风器改造成密闭型抽拉式暖风器,蒸汽进口与凝结水出口均采用独具特色的可拆卸法兰连接,具有良好密封效果且拆装方便。可在不停机的情况下实现抽出和拉入,灵活切换。在非冬季时,可抽离风道,减少一次风阻力。解决了一次风阻力和增加厂用电耗的问题,实现了节能降耗的目的。
The fixed type air heater for ShouGang’ s 2×300 MW boiler used to remainin the air duct in non-winter seasons, which increased resistance and power consumption.Through technical transformation, the heater was transformed into sealed pull-out air heater,with both the steam inlet and condensate outlet connected with detachable flanges, which notonly has good sealing effect but is also convenient to assemble and disassemble. Extractionand pull-in can be carried out without system shutdown, achieving flexible switchover. Innon-winter seasons, the air heater can be removed from air duct to reduce wind resistance,which reduces primary air resistance and power consumption rate and saves energy.
作者
贾希存
汪明宇
Jia Xicun;Wang Mingyu(Shougang Jingtang United Iron and Steel Co.,Ltd.,Tangshan,Hebei 063200,China)
出处
《冶金动力》
2018年第7期42-45,共4页
Metallurgical Power
关键词
密封型抽拉式
暖风器
节能降耗
改造
sealed withdrawing type
air heater
energy saving and consumption reduction
transformation