期刊文献+

现浇箱梁中后张法预应力施工控制及实施要点分析 被引量:4

Construction Control and Implementation Analysis of Post-tensioned Prestressed Concrete Box Girder
下载PDF
导出
摘要 针对现浇箱梁后张法预应力施工控制以及实施要点展开分析,对预应力筋张拉作用原理探索,对现浇箱梁后张法预应力施工材料的控制做出阐述,对现浇箱梁中后张法预应力张拉质量控制进行研究,最后从现浇箱梁中后张法预应力筋及波纹管质量控制、现浇箱梁中后张法预应力混凝土浇筑质量控制,现浇箱梁后张法预应力压浆质量控制等方面详细探索,总结出适当的控制方式,清楚规划实施要点。 In this paper,according to the post-tensioned prestressed construction control and key points of cast-in-place box girder,the principle of prestressing tendon tension is first explored,and then the control of prestressed construction material of post.The prestressing tension control of post-tensioning method in cast-in-place box girder is studied again.The prestressing tension of posttensioning method and quality control of corrugated tube in cast-quality control,post-tensioning of cast-in-place box girder posttensioning grouting quality control and other aspects of exploration in detail,summed up the appropriate control methods,clearly plan the implementation of the main points.
作者 倪磊 Ni Lei
出处 《建筑技术开发》 2018年第13期105-106,共2页 Building Technology Development
关键词 现浇箱梁 后张法 预应力 施工控制 cast-in-place box girder post-tension method prestressing construction control
  • 相关文献

参考文献5

二级参考文献12

共引文献35

同被引文献18

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部