期刊文献+

世界银行贷款项目执行管理的分析与研究 被引量:1

Analysis and Research on Execution Management of World Bank Loan Project
下载PDF
导出
摘要 世界银行(以下简称"世行")贷款项目的建设周期分为:项目立项、项目准备、项目评估、项目谈判、项目执行与监督、项目后评价六个阶段。项目执行管理是项目管理的一个重要组成部分,管理的好与坏将直接关系到项目的成败,项目执行管理覆盖项目整个执行期。本文以世行贷款项目湖北宜巴高速公路为例,重点阐述世行贷款项目执行管理与监测评价这一套行之有效的制度,可供我国工程建设投资管理借鉴。 The construction period of the World Bank loan project is divided into six phases: project approval, project preparation,project evaluation, project negotiation, project implementation and supervision, and post-project evaluation. Project execution management is an important part of project management. Good or bad management will directly affect the success or failure of the project. Project execution management covers the entire implementation period of the project. This paper takes the Hubei Yiba Expressway which belongs to World Bank loan project as an example, focuses on the effective management and monitoring evaluation system of the World Bank loan project,which can be used for reference in China's engineering construction investment management.
作者 肖靖炜 张小剑 XIAO Jing-wei;ZHANG Xiao-jian(CCCC Second Highway Consultants Co.,Ltd.,Wuhan 430056,China)
出处 《价值工程》 2018年第17期57-58,共2页 Value Engineering
关键词 中国项目 世界银行贷款 高速公路 项目完工 后评价 China project World Bank loan expressway project completion post-evaluation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部