摘要 以合肥地铁3号线某区间隧道为工程背景,运用有限元数值模拟软件MADAS/GTS建立三维隧道施工的数值模型,计算隧道施工过程中引起的地表沉降。分析盾构施工在不同掘进距离条件下地表沉降的变形规律。模拟结果表明:在拱顶位置地表产生沉降最的大竖向位移。隧道下部围岩的最大隆起发生在拱底处;地表横向沉降范围随着开挖面的推进而不断加大,盾构施工的横向影响范围为隧道直径D的3倍。盾构施工造成的隧道下部围岩横向沉降影响范围约为洞径的2倍。 Taking the tunnel of a section of Hefei Metro Line 3 as the engineering background,the numerical model of 3 D tunnel construction was established using finite element numerical simulation software MADAS/GTS and calculate surface settlement caused by tunnel construction. The deformation of surface settlement under different tunneling distances of shield construction was analyzed. The simulation results showed that the most significant vertical displacement of the ground surface at the vault location occurred. The maximum bulge in the surrounding rock of the tunnel occurred at the bottom of the arch. Surface subsidence range continued to increase as the excavation surface advanced. The scope of horizontal effect of shield construction was 3 times the diameter of the tunnel. The scope of the lateral settlement of the surrounding rock in the lower part of the tunnel caused by shield construction was about 2 times the diameter of the tunnel.
作者 朱荣军 席培胜 王枫 沈晨 ZHU Rong-jun;XI Pei-sheng;WANG Feng;SHEN Chen(Anhui Jianzhu University,Anhui Urban Construction and Underground Space Engineering Technology Research Center,Hefei Anhui 230601,China)
出处 《佳木斯大学学报(自然科学版)》 CAS 2018年第3期346-349,共4页 Journal of Jiamusi University:Natural Science Edition
基金 超浅埋城市道路下人行隧道暗发展基金(D0750802) 安徽高等学校自然科学研究项目(KJ2015A046)
关键词 盾构施工 地表沉降 数值模拟 MADAS/GTS shield construction ground surface settlement numerical simulation MADAS/GTS