厄瓜多尔CCS项目双护盾TBM通过断层破碎带施工技术研究与实施 被引量:6

Research and implementation of construction technology of double-shield TBM penetrating fault fracture zone in Ecuador CCS Project
下载PDF
导出
摘要 本文结合厄瓜多尔CCS项目水电站输水隧洞工程,选取"旁洞+上导洞揭顶开挖"施工方案,使双护盾TBM安全高效通过50米破碎带,形成双护盾TBM快速施工方法,可供同类工程参考。 Based on the water conveyance tunnel project of CCS hydropower station in Ecuador,this paper selects the construction scheme of " side tunnel + top-opening excavation of upper guide tunnel" so that the double shield TBM can safely and efficiently pass through the 50-meter crushing zone,forming a quick construction method of the double shield TBM,which can be used as a reference for similar projects.
作者 张国 ZHANG Guo(China Water Conservancy and Hydropower No.10 Engineering Bureau Co.,Ltd.,Chengdu 610072,China)
出处 《水利建设与管理》 2018年第6期1-6,共6页 Water Conservancy Construction and Management
关键词 双护盾TBM 断层破碎带 施工方案 实施效果 double-shield TBM fault fracture zone construction plan implementation effect
  • 相关文献

同被引文献62

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部