摘要
本文结合厄瓜多尔CCS项目水电站输水隧洞工程,选取"旁洞+上导洞揭顶开挖"施工方案,使双护盾TBM安全高效通过50米破碎带,形成双护盾TBM快速施工方法,可供同类工程参考。
Based on the water conveyance tunnel project of CCS hydropower station in Ecuador,this paper selects the construction scheme of " side tunnel + top-opening excavation of upper guide tunnel" so that the double shield TBM can safely and efficiently pass through the 50-meter crushing zone,forming a quick construction method of the double shield TBM,which can be used as a reference for similar projects.
作者
张国
ZHANG Guo(China Water Conservancy and Hydropower No.10 Engineering Bureau Co.,Ltd.,Chengdu 610072,China)
出处
《水利建设与管理》
2018年第6期1-6,共6页
Water Conservancy Construction and Management
关键词
双护盾TBM
断层破碎带
施工方案
实施效果
double-shield TBM
fault fracture zone
construction plan
implementation effect