参照安装工程施工规范,结合实际工程案例,详细的阐述了住宅小区地库及室外综合管线施工步骤及需注意的细节问题,从而完整的完成车库综合管线的施工。
According to the construction standard of installation engineering,combined with the actual project example,the construction procedure and the details of the construction of the underground and outdoor integrated pipeline are expounded. So as to completely accomplish the comprehensive pipeline construction of the garage.
作者
杨国江
Yang Guojiang(Taiyuan Taihe Real Estate Co.,Ltd,Taiyuan 030000,China)
出处
《山西建筑》
2018年第14期112-114,共3页
Shanxi Architecture
关键词
地库综合管线
管线布置
施工顺序
underground comprehensive pipeline
pipeline layout
construction sequence