摘要
以某大长隧道初期支护施工中使用的机械手湿喷混凝土施工为例,分别从原材料质量要求、施工关键工序控制、确保施工质量措施等方面进行了介绍,以确保隧道初期支护效果、提高隧道施工安全性和施工环境,确保隧道工程效益。
Taking the manipulator wet-spraying concrete construction in the super-long tunnel preliminary support construction as an example,the paper respectively introduces the raw material quality requirement,critical construction procedure control and guaranteeing construction quality measures,with a view to guarantee the preliminary tunnel support effect,to improve the tunnel construction safety and construction environment,and to ensure the tunnel engineering efficiency as well.
作者
杜庆宏
Du Qinghong(Shanxi Jinzhong Highway Bridge Construction Group Co.,Ltd,Jinzhong 030600,China)
出处
《山西建筑》
2018年第14期180-181,共2页
Shanxi Architecture
关键词
隧道
支护施工
机械手
tunnel
support construction
manipulator