摘要
主要围绕清单编制细节问题展开讨论,分析了建筑工程清单编制存在的一些问题,并探讨其存在问题的原因,对建筑工程量清单编制提出有效的应对策略,以提高建筑工程工程量清单编制的准确性。
This paper mainly discussed the details of list compilation,analyzed some problems existing in the compilation of bill of quantities for construction engineering,and discussed the reasons for its existing problems,put forward effective coping strategies for the compilation of bill of quantities for construction engineering,in order to improve the accuracy of the compilation of bill of quantities for construction engineering.
作者
尉仁凤
Wei Renfeng(Shanxi Fifth Construction Group Limited Company,Taiyuan 030013,China)
出处
《山西建筑》
2018年第14期213-214,共2页
Shanxi Architecture
关键词
建筑工程
工程量清单
清单编制
building engineering
bill of quantities
list compilation