摘要
本文针对区域能源项目投运初期的低负荷运行状况建立了以单时段运行优化为核心的生产运行优化方法。根据此方法,对区域能源项目存在的各类低负荷状况给出优化运行的策略,并对区域能源项目的建设提出建议。
The article is focused on low load operation condition of regional energy project during initial stage and puts forward opti- mized production operation method based on single timeline opera- tion optimization as core. According to this method, the author gives optimized operation strategy and suggestions for all kinds of existing low load condition in regional energy projects.
作者
高雄伟
Gao Xiongwei(Shanghai Shenergy Energy Service Co.,Ltd)
出处
《上海节能》
2018年第6期410-416,共7页
Shanghai Energy Saving
关键词
区域能源
低负荷
运行优化
Regional Energy
Low Load
Operation Optimization