摘要
应用自稳隐形拱理论对董东煤矿50130开切眼顶板稳定性进行了分析,设计了开切眼一次成巷支护方案,确定了锚杆、锚索长度,锚杆直径和间排距。实测表明,采用全断面一次成巷技术减少了工序环节,缩短了开切眼施工时间,取得了较好的经济效益和社会效益。
By using the theory of self stabilizing invisible arch, the roof stability of No. 50130 open-off cut in Dongdong coal mine was analyzed,the once-tunneling supporting scheme of open-off cut was designed,and the supporting parameters were determined. The practice shows that using the once-tunneling technology can reduces the process links, shortens the construction time of the open-off cut,and achieves better economic and social benefits.
作者
白新荣
BAI Xin-rong(Shaanxi Chengcheng Dongdong Coal Industry Co., Ltd., Weinan 715200, China)
出处
《陕西煤炭》
2018年第3期115-117,130,共4页
Shaanxi Coal
关键词
开切眼
锚杆施工
自稳隐形拱
一次成巷
open-off cut
anchor construction
self stabilizing invisible arch
once-tunneling