摘要
目前,大直径嵌岩桩嵌岩深度计算结果偏差较大。针对此问题,以鼠浪湖矿石中转码头大直径嵌岩桩现场水平力试验结果为基础,对比各种公式计算出的结果。得出目前采用的几种方法计算出的嵌岩深度偏差较大,而张有龄法计算出的嵌岩深度比较符合实际情况的结论。推荐采用张有龄法计算大直径嵌岩桩的嵌岩深度,并给出计算公式。
At present, the calculation results of large diameter rock-socketed pile rock-socketed depth are deviated greatly.Based on the test results of large diameter rock-socketed pile in Shulanghu mine transfer wharf, the results are compared with the various formulas.It is concluded that the embedded depth of rock-socketed depth is relatively large, and the rock-socketed depth calculated by ZHANG You-ling method is in accord with the actual situation.It is recommended to calculate large diameter rock-socketed pile rock-socketed depth by Zhang You-ling method and give the calculation formula.
作者
杨荣君
王世军
周元
YANG Rong-jun;WANG Shi-jun;ZHOU Yuan(CCCC Third Harbor ConsultantsCo.,Ltd.,Shanghai 200032,China;Zhoushan Port and Navigation Administration,Zhoushan 316000,China)
出处
《水运工程》
北大核心
2018年第6期247-251,共5页
Port & Waterway Engineering
关键词
大直径嵌岩桩
嵌岩深度
张有龄法
large diameter rock-socketed piles
rock-socketed depth
Zhang You-ling method