可控移热变换炉运行总结 被引量:1

Operation Summary of Controllable Heat Removal Shift Converter
下载PDF
导出
摘要 原3套变换装置均采用绝热固定床反应器,存在能耗高、安全性差等问题,采用等温变换技术将3套装置合并为1套,并将合成氨产能由660 t/d提高至750 t/d。概述了等温变换技术所采用的可控移热变换炉的技术原理、主要设计参数和运行数据、操作要点,对运行中出现的常见问题进行原因分析并给出处理措施。 The original 3 sets of shift plants adopting adiabatic fixed bed reactor have high energy consumption and poor security problems. The original 3 sets of shift plants are merged into 1 set with isothermal shift technology, and the ammonia production capacity is enlarged from 660 t/d to 750 t/d. The technology principle, main design parameters, operation data and operation key points of controllable heat removal shift converter used in isothermal shift technology is summarized. And common problems in the operation are analyzed and con'esponding treatment measures are presented.
作者 陈超 CHEN Chao(Linyi Branch of Yangmei Fengxi Fertilizer Industry Co.,Ltd.,Yuncheng 044100,China)
出处 《化肥工业》 CAS 2018年第3期53-55,共3页 Chemical Fertilizer Industry
关键词 等温变换 可控移热变换炉 运行总结 isothermal shift controllable heat removal shift converter operation summary
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部