摘要
绥中发电厂二期工程配套码头项目采用离岸引桥式码头布置形式,本文结合工程周边项目现状、自然条件及工程近远期发展对码头平面布置展开研究,优化比选出推荐方案并通过数学模型验证。
An offshore jetty attached with an approach trestle is designed for the Phase 2 Coal Terminal of Suizhong Power Plant. Studies have been conducted on the general layout of the coal terminal, taking into account the existing environment of the project, the natural conditions of the site and the development trend of the terminal. Through the comparison among a number of plans, an optimized option is finally worked out and recommended, and verified by mathematic model.
作者
吴明臻
王学诗
郭放
Wu Mingzhen;Wang Xueshi;Guo Fang(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处
《港工技术》
2018年第A01期14-17,共4页
Port Engineering Technology
关键词
平面布置
方案比选
数学模型
general layout
options selected
mathematical model