摘要
工程造价的高低在很大程度上受设计方案的质量与复杂程度的影响,设计标准越高造价就越高。目前我国大型深基坑项目越来越多,基坑支护方案也多种多样,工程造价受设计阶段的影响较大,本文通过实际案例说明不同方案下造价的差异。
The cost of a construction work is to a large extent affected by the quality and complexity of the design plan, the higher the design standards, the higher the cost. At present, more and more deep foundation pits are used in construction works in our country, and the pit wall bracing plans also vary from each other at different locations. The construction cost is greatly influenced by the design methodology for the construction work.