摘要
在火力发电厂施工中,施工单位需要针对施工现场情况,针对施工现场情况,制定完善的施工质量管理机制,对施工单位进行全面的控制,不断引进先进的施工技术,进一步提升施工的效率,满足火力发电厂工程施工质量标准。但是在实际施工过程中,受到多方面因素的影响,导致在实际施工过程存在很多问题,严重降低了工程建设的综合效益。因此,本文首先火力发电厂施工中存在的问题,然后结合实际情况,针对管理策略展开论述。
During the construction of thermal power plants, the construction unit needs to take the situation of the construction site into consideration, formulate and improve the construction quality management mechanism, comprehensively control the construction unit, and continuously introduce advanced construction technology to further enhance the construction efficiency,to meet the construction quality standards for thermal power plant engineering. However, in the actual construction process, it was affected by many factors, resulting in many problems in the actual construction process, which seriously reduced the overall benefits of the project construction. Therefore, this paper firstly discusses the problems existing in the construction of thermal power plants, and then discusses the management strategies in light of the actual situation.
作者
唐立明
TANG Li-ming(Zhejiang Second Construction Group Co.,Ltd.,Ningbo 315202,China)
出处
《价值工程》
2018年第19期41-42,共2页
Value Engineering
关键词
火力发电厂
施工
存在问题
管理策略
thermal power plant
construction
existing problems
management strategy