摘要
以某高层住宅楼项目CL(composite light-weight)结构体系施工为例,结合CL网架板的存放、吊装及节点连接锚筋绑扎、模板搭设、自密实混凝土的浇筑、模板拆除及混凝土的养护等关键工序,探讨CL结构体系的施工要点,并针对施工中存在的诸多问题提出改进措施,以期为CL结构体系的推广应用提供借鉴。
In view of many problems existing in the construction of CL structure system, taking the construction of CL structure system in an engineering project as an example, the paper explores the key processes such as the storage, hoisting, anchoring and joint connection of CL frame, template setting, self-compacting concrete pouring, template removal of CL composite shear wall and concrete maintenance. The key points of the construction of CL structure system are discussed as well. The corresponding measures are proposed to solve the problems in construction, which can provide reference for the wide application of CL structure system.
作者
陈佳佳
殷庆
朱燕
CHEN Jia-jia;YIN Qing;ZHU Yan(Beijing Headquarters Engineering Center,Jiangsu Nantong Liujian Construction Group Co.,Ltd,Nantong 226500,China;School of Civil Engineering,Nantong Vocational University,Nantong 226007,China;Geotechnical Research Institute,Hohai University,Nanjing 210098,China)
出处
《南通职业大学学报》
2018年第2期96-100,共5页
Journal of Nantong Vocational University
基金
江苏高校品牌专业建设工程资助项目(PPZY2015B183)
南通市科技项目(MS12015032)
关键词
CL结构体系
关键工序
改进措施
CL structure system
key process
improvement measures