6Kunz J, Fischer M, Haymaker J, et al. Integrated & Automated Project Processes in Civil Engineering: Ex- periences of the Center for Integrated Facility Engi- neering at Stanford University [ R ]. California: CIFE Technical Report #132 February, 2002 .
7Teicholz P, Fischer M. Strategy for computer integrated construction technology [ J ]. Journal of Construction Engineering and Management, 1994, 120 ( 1 ) : 117- 131.
8Suzuki N, Akiba J, Whorlow J. A Study on Effective Construction Management Utilising Civil Information Modeling/Management ( CIM ) [ C ]//2014 Interna- tional Conference on Computing in Civil and Building Engineering. Orlando: ASCE,2014 : 1489-1496.
9Tatum C,Luth G. Integrating Structural and Construc- tion Engineering[ C ]//Construction Research Congress 2012. West Lafayette :ASCE,2012 : 1301-1310.
10Kurdziel J, Nelson C, Nystrom J. Intelligent Construc- tion Systems: the Convergence of Computing, Commu- nication and Construction [ C ]//Joint Conference on Water Resource Engineering and Water Resources Planning and Management 2000. Minneapolis : ASCE,2000 : 1-9.