摘要
介绍了长沙地铁1号线车辆辅助逆变器200%过载故障产生原理,通过多种试验模拟重现辅助逆变器200%过载故障,查找引起该故障的原因,并制定合理的整改措施,有效解决辅助逆变器过流故障。
The Changsha Metro Line 1 vehicle auxiliary inverter 200% overload fault principle,through a variety of experiments to reproduce the auxiliary inverter 200% overload fault,find the rootcause of the fault,then establish proper rectification measures,effectively solve the auxiliary inverter overcurrent fault.
作者
王烟平
WANG Yanping(Changsha Rail Transit Operation Co.,Ltd.,Changsha 410133 Hunan,China)
出处
《铁道机车车辆》
北大核心
2018年第3期116-120,共5页
Railway Locomotive & Car