摘要
以城开中心超高层综合体施工为例,介绍沈阳核心商圈复杂环境下大型施工设备的布置优化,不同阶段塔吊换拆的策划与实施,塔吊基础与底板、施工升降机基础与围护结构的一体化设计与施工,以期为同类工程提供借鉴。
Took the construction of the super high-rise building in urban development center as an example,this paper introduces the layout optimization of large-scale construction equipment under the complex environment of Shenyang primary trading area,the planning and implementation of replacement and demolition of tower cranes at different stages,and the integrated design and construction of tower crane foundation and floor,construction hoist foundation and retaining structure,in reference for the similar projects in the future.
作者
高阔
GAO Kuo(Shanghai Construction NO.5(Group)Co.,Ltd.,Shanghai 200063,China)
出处
《工程质量》
2018年第6期24-26,31,共4页
Construction Quality
关键词
复杂环境
塔吊换拆
基础一体化
BIM技术
complex environment
tower crane in demolition
basic integration
BIM technology