某边坡工程的加固措施研究 被引量:1

Researches on Reinforcement Measures of a Slope project
下载PDF
导出
摘要 结合工程实例,阐述了某边坡初次加固失败,进而采用二次加固措施。二次加固要考虑初次加固排桩的有利作用,最终确定在已有支护桩前加打两排冲(钻)孔灌注桩,用冠梁、连梁板、竖向斜撑梁以及桩间腰梁将两次支护桩连成一个整体,形成刚度较大的加固体系。该加固体系在完工后的监测中,变形量较小,满足安全要求。 Based on an engineering project,this paper stated the failure of the initial reinforcement on a slope,and the second reinforcement measures adopted. The effect of initial reinforcement of the row piles should be considered during the second reinforcement. Therefore,it was determined that two rows of impact-cone concrete piles( or bored piles) Were added before the existing retaining piles,and that crown beam,coupling beam board,vertical brace beam and waist beam between piles were utilized to connect the two support piles to form the reinforcing system with a greater stiffness. In the post-completion of the reinforcement system,the deformation was small from the monitoring results. It can meet the safety requirements.
作者 关海燕 GUAN Haiyan(Fujian Province Min Wu Chang Cheng Geotechnical Engineer Co.,Ltd.,Fuzhou 350013)
出处 《福建建筑》 2018年第6期93-96,共4页 Fujian Architecture & Construction
关键词 边坡 加固 双排桩 边坡监测 Slope reinforcement Double-row of piles Slope monitoring
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部