期刊文献+

北京山区径流侵蚀过程及WEPP模型适用性评价 被引量:3

The Runoff-erosion Process and the Estimation of WEPP Model in Beijing Mountainous Area
下载PDF
导出
摘要 北京土石山区多发严重的土壤侵蚀甚至是泥石流,因此如何通过植被控制侵蚀,进而通过侵蚀模型预测预报侵蚀就显得十分重要。在北京山区简易径流小区内,人工模拟降雨5种雨强(5.7~75.6mm/h)、不同树种(油松、栓皮栎)及不同株行距(1.0m×1.0m,1.5m×1.5m),探究树冠特征和降雨特征对径流侵蚀过程的影响,以及WEPP模型对径流过程、总径流量和总产沙量的模拟效果。结果表明:(1)小雨下(总降雨量≤25.2mm)裸地与有林小区的累计径流量存在显著差异(p=4.9E-11),大雨下(总降雨量49.8,75.6mm)差异不明显(p=0.35),裸地与有林小区在总径流量和径流系数上并没有差异显著(p=0.81,0.44),LAI与雨强均显著影响总径流量;(2)裸地小区总产沙量为有林小区的1.70倍,但ANOVA分析显示二者之间差异不显著(p=0.13),覆盖度与产沙率SLR之间存在良好的指数关系SLR=e-0.02C;(3)WEPP模型在大雨下对径流过程的模拟更为准确,小雨下对产流时间的模拟较实际产流时间延后10~20min,累计径流量模拟值与实测值的差距随降雨历时增加而不断增加;(4)WEPP模型对总径流量和总产沙量的模拟效果较好(效率系数CE=0.61,0.91),各雨强下总径流量和总产沙量的模拟值分别是实测值的1.01,1.25倍。 Soil erosion and landslides occur occasionally in Beijing mountainous area,and vegetation is of great importance to control and predict soil erosion.Previous studies mainly focused on the estimation of total runoff volume(TRV)and total sediment yield(TSY),and the test and simulation of runoff process has been largely disregarded even neglected.The study was conducted in runoff plots in mountainous area in Beijing to examine the simulation accuracy of WEPP model on runoff process,TRV and TSY under different simulated rainfall intensities(5.7~75.6 mm/h),tree species(Pinus tabulaeformis,Quercus variabilis)and spacing(1.0 m×1.0 m,1.5 m×1.5 m).Results indicated that:(1)Significant differences were observed in accumulative runoff between bare soil plot and forested plots under light rainfalls(gross precipitation≤25.2 mm),while such differences were not captured in TRV and runoff coefficient.Both LAI and rainfall intensity significantly influenced TRV.(2)Though TSY in bare soil plot was 1.70 times larger than that in forested plots,no significant differences were found in ANOVA analysis,the soil loss rate(SLR)showed fine power relations with forest coverage in the equation SLR=e-0.02 C;(3)Generally,the runoff process could be simulated accurately by WEPP model,yet the accuracy increased under heavy rainfalls(total precipitation was 49.8 and 75.6 mm).In contrast,the simulated time to runoff was 10~20 minutes later compared with the measured under light rainfall,and the simulated accumulative runoff was always higher than the measured value,and the gap between the simulated and measured increased with the increasingrainfall duration;(4)TRV and TSY were simulated well in WEPP model with CE of 0.61 and 0.91,respectively.Whereas the simulated TSY and TRV were 1.25 and 1.01 times larger than the measured values.
作者 李想 曾以禹 朱思雨 牛健植 李娇 杜晓晴 LI Xiang1,2,3,ZENG Yiyu1,ZHU Siyu2,3,NIU Jianzhi2,3,LI Jiao2,4,Du Xiaoqing2,5(1. China National Forestry Economics and Development Research Center, State Forestry Administration, Beijing 100714 ;2. College of Soil and Water Conservation , Beijing Forestry University, Beijing 100083 ; 3. Key Laboratory of Soil and Water Conservation and Deserti fication Combating, State Forestry Administration, Beijing 100083;4. Forestry Planning Institute, Xinjiang Uygur Autonomous Region, Urumqi 830000; 5. Piling Engineering Co. Ltd. , Beijing 10009)
出处 《水土保持学报》 CSCD 北大核心 2018年第3期98-106,共9页 Journal of Soil and Water Conservation
基金 国家自然科学基金项目(41271044) 国家林业局经济发展研究中心青年研究课题项目
关键词 径流过程 土壤侵蚀 WEPP模型 累计径流量 总侵蚀量 runoff process soil erosion water erosion prediction project model accumulate runoff volume total sediment yield
  • 相关文献

参考文献6

二级参考文献94

共引文献159

同被引文献40

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部